Specs
builder
Hatteras
N/A
guests
N/A
Location
United States
Condition
Used
STATEROOMs
3
N/A
Type
Power
N/A
crew
0
N/A
length
59.00
FT
beam
18.75
FT
Year
2021
N/A
draft
4.75
FT
model
GT59
N/A
speed
38
KT
Price
$
3599000
€
C$
PRICE ON APPLICATION
volume
0
GT
CHANGE ORDER
'Change Order' is one of the newest Hatteras GT59s available. She is broken in and ready for the next owner. This 3 stateroom, 2 head layout with the master aft and tackle room provides the comfort and fishability for long extended fishing excursions. The main deck layout has the preferred peninsula galley with subzero drawer fridges, range and a dinette to stbd. Also to stbd is a popup TV in the Satin teak cabinet and bottle storage with icemaker. The salon sofa has storage and a coffee table with storage that can raise to dining level.
Equipped with Cat C32s, she cruises at 30 knots and has a top end of 37 knots. These engines are still under Platinum Plus warranty until 2025 and can be extended further.
All new Garmin electronics package in 2022.
